My5LA My5LA

Menu
  • Home
  • I-5 North
    • SR-14 to Lake Hughes Road
    • Magnolia Blvd to Buena Vista St
    • Ventura Freeway (SR-134) to Magnolia Blvd
  • Valley View
    • Updates – Valley View Ave. Interchange Project
    • Valley View Interchange Project
  • I-5 South
  • Completed
    • Alondra Boulevard Bridge
    • Carmenita Road Interchange
    • Florence Ave Interchange Project
    • Hollywood Freeway (SR-170) to Buena Vista St
    • Lake Hughes Rd to Vista Del Lago Rd
    • Imperial Highway and Pioneer Boulevard
    • I-5/Antelope Valley Fwy (SR-14) Interchange
    • Rosecrans Avenue and Bloomfield Avenue Bridge
    • SR-14 to Pico Canyon Road/Lyons Avenue
    • SR-118 to Hollywood Fwy (SR-170)
    • SR-118 to I-210
    • Vista Del Lago Rd Overcrossing to Kern County Line
    • Western Ave Interchange
  • Galleries
  • Updates
  • Contact

You are here:

  1. Home
  2. 10-19-13 to 10-20-13 Closure List BOTH Directions Fwy closure (Rosecrans Avenue and Bloomfield Avenue Bridges)

10-19-13 to 10-20-13 Closure List BOTH Directions Fwy closure (Rosecrans Avenue and Bloomfield Avenue Bridges)

October 15, 2013 by CALTRANS

Download a PDF format of this notice

Print Friendly, PDF & Email
Posted in:
  • Closures-Rosecrans Avenue

See more

  1. Prev:10-13-13 to 10-18-13 Closures List (SR-118 to SR-170)
  2. Back: All Posts
  3. Next:Ongoing through early November 2013 Construction Notice Final Ramp Improvements – NB & SB I-5 Intermittent Ramp Closures (SR-170 to Buena Vista)

Twitter Feed

On I-5 in #Burbank between Magnolia Blvd and Buena Vista St., crews are working at night to install signs, seal joints in new pavement, install traffic detector loops and other work. Some lanes may be closed from 9PM-6AM. Details: https://t.co/6NPBywrkIT @BurbankCA https://t.co/6NPBywrkIT August 8, 2022 4:40 pm Follow My5LA TRAFFIC ALERT - In #Burbank on Victory Place at Old Empire Ave., this stop sign will be removed when this new traffic signal is activated in the near future. Please be alert for this change, on the west side of the I-5 Empire interchange @BurbankCA @BurbankPD https://t.co/QrBkA7B8i1 August 6, 2022 3:15 pm Follow My5LA Crews are constructing street improvements and pedestrian ramps at or near I-5 interchanges in #Burbank. Please be aware of intermittent closures at some I-5 ramps and some street lanes. Details at: https://t.co/6NPBywrkIT @BurbankCA #infrastructure https://t.co/6NPBywrkIT August 5, 2022 5:23 pm Follow My5LA Workers are grading & installing concrete reinforced drainage pipe in preparation for paving the final new northbound lanes of I-5 at Valley View Avenue in La Mirada. https://t.co/xA5vA0m3BI #BeWorkZoneAlert https://t.co/xA5vA0m3BI August 4, 2022 1:30 pm Follow My5LA Crews are working at night on I-5 in #Burbank between Magnolia Blvd and Hollywood Way. Some lanes may be closed at night in either direction. Southbound I-5 HOV (carpool) lane opened this week. Northbound HOV lane will open soon. https://t.co/nt3fi7f9qG @BurbankCA https://t.co/nt3fi7f9qG July 29, 2022 9:50 pm Follow My5LA The new Southbound I-5 HOV (carpool) lane in #Burbank opened overnight- here are some of the first cars on it. Northbound HOV lane will open soon. Crews are working at night on SB & NB I-5 between Buena Vista & Magnolia Blvd @BurbankCA Details: https://t.co/MVeOdZj58z https://t.co/MVeOdZj58z July 28, 2022 6:22 pm Follow My5LA La Mirada: Workers are trenching & installing 24" reinforced concrete drainage pipe along the shoulder of northbound I-5 near Valley View Avenue. Please #BeWorkZoneAlert. https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI July 28, 2022 6:21 pm Follow My5LA La Mirada: Workers continue to install a rock blanket along S. Firestone Blvd. under the new Valley View Avenue on ramp to southbound I-5. Please #BeWorkZoneAlert https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI July 27, 2022 6:07 pm Follow My5LA BURBANK - Tonight Mon. 7/25 crews place asphalt on San Fernando Blvd (area shown in red). Tues. night 7/26 on Buena Vista St (area in red). Lanes will stay open for traffic. Some I-5 ramps will be closed w/detours. Details: https://t.co/MVeOdZj58z @BurbankCA #Burbank https://t.co/MVeOdZj58z July 25, 2022 10:46 pm Follow My5LA Southbound I-5 in #Burbank is reduced to 1 lane at night - tonight thru Thursday night July 28, starting 11PM, from Hollywood Way to Magnolia Blvd. Lanes reopen by 5AM. Some ramps closed w/detours. Details: https://t.co/MVeOdZj58z @BurbankCA @CHPAltadena @fly_BUR https://t.co/MVeOdZj58z July 25, 2022 9:59 pm Follow My5LA

Construction Notice Sign Up

 

Click through to sign up for Timely, Helpful My5LA Info regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe
 

Recent Posts

  • Valley View Ave. Interchange Project – August 5 – August 12, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, August 5-12, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, July 29-August 5, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, July 22-29, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, July 15-22, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, July 8-15, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, July 1-8, 2022

Archives

  • (213) 897-3656
  • My5LA@dot.ca.gov
  • Title VI Compliance
 
  • email
  • twitter
  • On I-5 in #Burbank between Magnolia Blvd and Buena Vista St., crews are working at night to install signs, seal joi… https://t.co/wiMTuQmv66

    4:40 pm, August 8, 2022

Follow @My5LA

  • On I-5 in #Burbank between Magnolia Blvd and Buena Vista St., crews are working at night to install signs, seal joi… https://t.co/wiMTuQmv66

    4:40 pm, August 8, 2022

  • TRAFFIC ALERT - In #Burbank on Victory Place at Old Empire Ave., this stop sign will be removed when this new traff… https://t.co/7FUXgl7xEb

    3:15 pm, August 6, 2022

  • Crews are constructing street improvements and pedestrian ramps at or near I-5 interchanges in #Burbank. Please be… https://t.co/wR5ViXsjsU

    5:23 pm, August 5, 2022

  • Workers are grading & installing concrete reinforced drainage pipe in preparation for paving the final new northbou… https://t.co/2CCIqSSx83

    1:30 pm, August 4, 2022

  • Crews are working at night on I-5 in #Burbank between Magnolia Blvd and Hollywood Way. Some lanes may be closed at… https://t.co/xy1qC0c66a

    9:50 pm, July 29, 2022

Follow @My5LA

Quick Links

  • I-5 South Overview
  • I-5 North Overview
  • Project Synopsis
  • Latest I-5 Construction Updates
  • Useful Links

Recent Posts

  • Valley View Ave. Interchange Project – August 5 – August 12, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, August 5-12, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, July 29-August 5, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, July 22-29, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, July 15-22, 2022

Stay Informed

Click through to sign up for our construction notices regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe

Our Partners

Our Partners
  • Home
  • Updates
  • Contact Us

© 2020 State of California

Back to Top