FLORENCE AVENUE INTERCHANGE PROJECT – Week of January 15, 2017

Drainage system installation and construction along Longworth Avenue between Harvest Avenue and Orr and Day Road (adjacent to northbound I-5), is tentatively scheduled to begin the week of January 23, weather permitting. Work will be conducted weekdays between 6:30 a.m. and 3:30 p.m. and is expected to take one to two weeks to complete.

Crews will be performing signal work at Florence Avenue and Orr and Day Road, intermittently over the next two weeks, weekdays between 9 a.m. and 3 p.m. This work will require lane reductions on Florence Avenue at Orr and Day Road; please expect delays and use an alternate route if possible.

In addition, crews will be performing drainage work underneath the northbound I-605 connector to southbound I-5 freeway; this work will require the connector to be closed for up to 55 hours, tentatively the weekend of January 20 through 22 and/or the weekend of January 27 through 29, weather permitting. Motorists will be directed to exit northbound I-605 at Imperial Highway, travel east on Imperial Highway, then south on SB Frontage Road to access the southbound I-5 freeway on-ramp. The connector is shown on red in the map below and the detour route is shown in blue.

 

Once the exact date(s) and time(s) for this work is finalized, additional information will be available on the Google project map below and on this website.

 

Pile driving operations have tentatively stopped along northbound I-5 at Florence Avenue and will resume in early 2017.