FLORENCE AVENUE INTERCHANGE PROJECT – Week of June 18, 2017

Crews will continue nighttime work to construct the falsework system for the new half of the Florence Avenue bridge. The falsework system is used as a gigantic  work table to provide support while constructing bridge and it includes a top, legs, feet and bracing. Just as a work bench is assembled, the pads or feet of the falsework touch the ground surface and the very top of the work bench is what crews call the soffit. It is atop that elevated surface of the falsework  where crews build and cast the new bridge superstructure.

Due to safety considerations this work must be conducted at night when the freeway can be closed. This operation is not expected to be excessively loud and / or disruptive. The following closures are planned next week as part of this work; visit the :

  • Northbound I-5 will be closed between Norwalk Boulevard and I-605, nightly, between 11:59 p.m. and 5 a.m., Wednesday, June 21 and Thursday, June 22. DETOUR: Motorists will exit northbound I-5 at  Norwalk Boulevard off-ramp, proceed west on Adoree Street, turn left on Imperial Hwy., turn right on Firestone Boulevard and proceed to the northbound I-605 on-ramp; then transition onto northbound I-5.
  • Southbound I-5 will be closed between I-605 and Norwalk Boulevard, nightly, between 11 p.m. and 5 a.m., Wednesday, June 21 and Thursday, June 22DETOUR: Motorists will be directed onto SB I-605 and exit Firestone Blvd., east on Firestone Blvd., east on Imperial Hwy., south on SB Frontage Rd. to access SB I-5 on-ramp
  • Northbound I-605 Connector to Southbound I-5 closed nightly, between 9 p.m. and 5 a.m., Wednesday, June 21 and Thursday, June 22. DETOUR: Motorists will exit NB I-605 at Imperial Hwy. off-ramp, east on Imperial Hwy., south on SB Frontage Rd. to access SB I-5 on-ramp
  • Southbound I-605 Connector to Southbound I-5 closed nightly, between 9 p.m. and 5 a.m., Wednesday, June 21 and Thursday, June 22. DETOUR: Motorists will continue on SB I-605, exit Firestone Blvd. off-ramp, east on Firestone Blvd., east on Imperial Hwy., south on SB Frontage Rd. to access SB I-5 on-ramp

Fence installation, vegetation removal and sound wall removal along the northbound I-5 Florence Avenue on-ramp, adjacent to Longworth Avenue, will continue next week. Once the sound wall removal operation is completed, crews will immediately begin work to construct the new sound wall. A privacy fence has been installed along Longworth Avenue, adjacent to northbound I-5 freeway. This work will be conducted weekdays, between 7 a.m. and 3:30 p.m. Please be advised, this work may be loud and disruptive due to concrete demolition and removal, equipment noise, sound wall construction activities and truck back-up alarms.

CIDH (cast in drilled hole) piles along northbound I-5 are currently on hold. Once this work is scheduled this operation will be conducted weekdays, between 7 a.m. and 3:30 p.m.

 