There is a planned closure of the Burbank Blvd bridge over I-5 on Saturday, March 14.
The bridge will remain closed until the replacement bridge opens in 14-16 months.
There is a planned closure of the Burbank Blvd bridge over I-5 on Saturday, March 14.
The bridge will remain closed until the replacement bridge opens in 14-16 months.