August 7.
-
Truck delivering concrete blocks for the sound wall.
-
August 7.
-
August 7.
-
-
-
Workers fill the barrier rail frame with concrete and level it.
-
Portion of the sound wall with the conceret barrier rail complete.
-
Facing eastbound across the Florence Ave. Bridge.
-
Facing westbound across the bridge.
-
Facing eastbound at the end of the bridge at Orr & Day Rd.
-
Back-to-back concrete trucks delivering concrete for the barrier rail on the freeway side of the on ramp.
-
Portion of the barrier rail on the freeway side of the Florence Ave. on ramp is complete.
-
Facing Orr & Day Rd.
-
14″ final layer of concrete for one new freeway lane (left) and surveyor stakes secured and grading complete for concrete pour (right). Facing north with the Florence Ave. Bridge in the distance.
-
One layer of final concrete (left), first layer of concrete (middle) and graded earth prepped for concrete pour (right). (Facing south).
-
August 7.
-
14″ layer of final concrete (facing south).
-
Facing south from the Florence Ave. Bridge, surveyors prep for the next concrete pour.