My5LA My5LA

Menu
  • Home
  • I-5 North
    • SR-14 to Lake Hughes Road
    • Magnolia Blvd to Buena Vista St
    • Ventura Freeway (SR-134) to Magnolia Blvd
  • Valley View
    • Updates – Valley View Ave. Interchange Project
    • Valley View Interchange Project
  • I-5 South
  • Completed
    • Alondra Boulevard Bridge
    • Carmenita Road Interchange
    • Florence Ave Interchange Project
    • Hollywood Freeway (SR-170) to Buena Vista St
    • Lake Hughes Rd to Vista Del Lago Rd
    • Imperial Highway and Pioneer Boulevard
    • I-5/Antelope Valley Fwy (SR-14) Interchange
    • Rosecrans Avenue and Bloomfield Avenue Bridge
    • SR-14 to Pico Canyon Road/Lyons Avenue
    • SR-118 to Hollywood Fwy (SR-170)
    • SR-118 to I-210
    • Vista Del Lago Rd Overcrossing to Kern County Line
    • Western Ave Interchange
  • Galleries
  • Updates
  • Contact

You are here:

  1. Home
  2. Works
  3. Florence Ave. – August 27, 2019

Florence Ave. – August 27, 2019

August 29, 2019

 

  1. August 27.
  2. August 27.
  3. August 27.
  4. August 27.
  5. August 27.
  6. August 27.
  7. August 27.
  8. August 27.
  9. August 27.
  10. August 27.
Print Friendly, PDF & Email
Posted in:
  • Construction Images
  • Florence Avenue
  • I-5 South
  • Outreach

See more

  1. Prev:Valley View Ave. – August 27, 2019
  2. Back: All Works
  3. Next:Valley View Ave. – September 3, 2019

Twitter Feed

Santa Fe Springs: the new Valley View Ave. off ramp from northbound I-5 is now OPEN to traffic! Traffic exits directly onto Valley View Ave. rather than onto N. Firestone Blvd. The old off ramp is closed for demolition. Photos below. https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI June 28, 2022 9:09 pm Follow My5LA Overnight full freeway closure of I-5 northbound in Santa Fe Springs has been reduced to lane closures. Scheduled: NB I-5 two lanes closed from Beach Blvd. to Alondra Blvd. from 10 p.m. to 5 a.m. the nights of Tuesday 6/28 & Wednesday 6/29. Details at https://t.co/7hyE6GTAKz https://t.co/7hyE6GTAKz June 28, 2022 7:10 pm Follow My5LA Workers constructing new sidewalk along S. Firestone Blvd. near the Valley View Avenue Bridge at I-5 in La Mirada. #BeWorkZoneAlert https://t.co/8U9HkM7YC5 June 22, 2022 2:03 pm Follow My5LA What is this? An Austin Vault sand filter near the future Valley View Avenue on ramp to southbound I-5 in La Mirada. It will filter debris & contaminants from freeway runoff. Under construction in March (left) & completed in June (right). https://t.co/xA5vA0m3BI #BeWorkZoneAlert https://t.co/xA5vA0m3BI June 21, 2022 6:23 pm Follow My5LA Some I-5 ramps in #Burbank and some lanes on city streets may have intermittent closures as crews place asphalt on streets and construct new curb/gutter. Crews working generally north to south as shown on map. Details: https://t.co/fN02g7X4Ud @BurbankCA @BurbankPD https://t.co/fN02g7X4Ud June 20, 2022 5:30 pm Follow My5LA Crews are constructing electrical and traffic-control systems for new HOV (carpool) lanes which will open this year on I-5 in #Burbank, also constructing a barrier along Northbound I-5. Details at: https://t.co/fN02g7X4Ud @BurbankCA #infrastructure https://t.co/fN02g7X4Ud June 18, 2022 3:15 pm Follow My5LA On I-5 in #Burbank between Magnolia Blvd and Hollywood Way, crews are grinding pavement at night to ensure a smooth level surface before HOV (carpool) lanes open this year. https://t.co/fN02g7X4Ud @BurbankCA https://t.co/fN02g7X4Ud June 17, 2022 6:35 pm Follow My5LA What is this? The new rock blanket over the median divider on the Valley View Avenue Bridge over I-5 in La Mirada/Santa Fe Springs. We expect to open a third lane in each direction of the bridge by the end of summer. https://t.co/xA5vA0m3BI #BeWorkZoneAlert https://t.co/xA5vA0m3BI June 17, 2022 1:52 pm Follow My5LA Starting this week in #Burbank, street repairs and improvements will cause intermittent closures of some I-5 on- and off-ramps during the next several weeks. Detours are provided when ramps are closed. Details at: https://t.co/HdOnYlDeqW @BurbankCA @BurbankPD https://t.co/HdOnYlDeqW June 15, 2022 11:22 pm Follow My5LA Starting this week in #Burbank, street repairs and improvements in the I-5 corridor will cause intermittent closures of some I-5 on- and off-ramps during the next several weeks. Detours are provided when ramps are closed. Details at: https://t.co/HdOnYlDeqW @BurbankPD https://t.co/HdOnYlDeqW June 13, 2022 8:41 pm Follow My5LA

Construction Notice Sign Up

 

Click through to sign up for Timely, Helpful My5LA Info regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe
 

Recent Posts

  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, June 24-July 1, 2022
  • Valley View Ave. Interchange Project – June 24 – July 1, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, June 17-24, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, June 10-17, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, June 3-10, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, May 27-June 3, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, May 20-27, 2022

Archives

  • (213) 897-3656
  • My5LA@dot.ca.gov
  • Title VI Compliance
 
  • email
  • twitter
  • Santa Fe Springs: the new Valley View Ave. off ramp from northbound I-5 is now OPEN to traffic! Traffic exits direc… https://t.co/1PPKep4pHG

    9:09 pm, June 28, 2022

Follow @My5LA

  • Santa Fe Springs: the new Valley View Ave. off ramp from northbound I-5 is now OPEN to traffic! Traffic exits direc… https://t.co/1PPKep4pHG

    9:09 pm, June 28, 2022

  • Overnight full freeway closure of I-5 northbound in Santa Fe Springs has been reduced to lane closures. Scheduled:… https://t.co/c0yrBsCvyd

    7:10 pm, June 28, 2022

  • Workers constructing new sidewalk along S. Firestone Blvd. near the Valley View Avenue Bridge at I-5 in La Mirada.… https://t.co/y64fQZZaii

    2:03 pm, June 22, 2022

  • What is this? An Austin Vault sand filter near the future Valley View Avenue on ramp to southbound I-5 in La Mirada… https://t.co/7APHN6y0Ve

    6:23 pm, June 21, 2022

  • Some I-5 ramps in #Burbank and some lanes on city streets may have intermittent closures as crews place asphalt on… https://t.co/p4S06Uy2W1

    5:30 pm, June 20, 2022

Follow @My5LA

Quick Links

  • I-5 South Overview
  • I-5 North Overview
  • Project Synopsis
  • Latest I-5 Construction Updates
  • Useful Links

Recent Posts

  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, June 24-July 1, 2022
  • Valley View Ave. Interchange Project – June 24 – July 1, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, June 17-24, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, June 10-17, 2022
  • I-5 Construction Advisory – Magnolia Blvd to Buena Vista Street, June 3-10, 2022

Stay Informed

Click through to sign up for our construction notices regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe

Our Partners

Our Partners
  • Home
  • Updates
  • Contact Us

© 2020 State of California

Back to Top