My5LA My5LA

Menu
  • Home
  • I-5 North
    • SR-14 to Lake Hughes Road
    • Magnolia Blvd to Buena Vista St
    • Ventura Freeway (SR-134) to Magnolia Blvd
  • Florence
    • News – Florence Avenue Interchange
    • Florence Ave Interchange Project
  • Valley View
    • News – Valley View Interchange Project
    • Valley View Interchange Project
  • I-5 South
  • Completed
    • Alondra Boulevard Bridge
    • Carmenita Road Interchange
    • Lake Hughes Rd to Vista Del Lago Rd
    • Hollywood Freeway (SR-170) to Buena Vista St
    • Imperial Highway and Pioneer Boulevard
    • I-5/Antelope Valley Fwy (SR-14) Interchange
    • Rosecrans Avenue and Bloomfield Avenue Bridge
    • SR-14 to Pico Canyon Road/Lyons Avenue
    • SR-118 to Hollywood Fwy (SR-170)
    • SR-118 to I-210
    • Vista Del Lago Rd Overcrossing to Kern County Line
    • Western Ave Interchange
  • Galleries
  • Updates
  • Contact

You are here:

  1. Home
  2. Works
  3. Imperial Hwy. / Pioneer Blvd. – December 11, 2018

Imperial Hwy. / Pioneer Blvd. – December 11, 2018

December 14, 2018

  1. December 11
Print Friendly, PDF & Email
Posted in:
  • Construction Images
  • I-5 South
  • Imperial Highway
  • Pioneer Blvd

See more

  1. Prev:Valley View Ave. – December 4, 2018
  2. Back: All Works
  3. Next:Florence Ave. – December 11, 2018

Twitter Feed

On I-5 at Burbank Blvd - Rebar (reinforcing rods) at the footing of the eastern abutment (end wall) of the new Burbank Blvd bridge. Crews are constructing carpool lanes in both directions on I-5 and a new interchange here. https://t.co/wWE6q9hmA5 #Burbank @BurbankCA https://t.co/wWE6q9hmA5 March 4, 2021 3:56 pm Follow My5LA Deck-level view of workers covering rebar stem walls with lumber forms in preparation for first concrete pour on middle section of second half of new Valley View Ave. Bridge at I-5 in La Mirada. @CaltransHQ @CaltransOC @CityofLaMirada @CityofSFS https://t.co/zlWQBxP044 March 4, 2021 2:22 pm Follow My5LA Aerial view of middle section of second half of Valley View Ave. Bridge at I-5 in La Mirada. Workers covering rebar stem walls with lumber forms in preparation for first concrete pour. @CaltransHQ @CaltransOC @CityofLaMirada @CityofSFS @CHP_SFS https://t.co/dqNNlUmgAk March 3, 2021 2:20 pm Follow My5LA New S. Firestone Blvd. ramp connecting to Valley View Ave. Bridge is open to traffic with a stop sign at the intersection. This allows traffic from Alondra Blvd./Marquardt Ave. to connect directly to Valley View Ave. @CityofSFS @CityofLaMirada @chp_sfs https://t.co/0rhlOs5lJu March 2, 2021 8:10 pm Follow My5LA Traffic using the new right lane open to traffic on NB Valley View Ave. between N. Firestone Blvd. & Alondra Blvd. (Vehicles turning right onto Valley View Ave. from Firestone Blvd.) https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI March 2, 2021 4:34 pm Follow My5LA Crews are constructing the I-5 Burbank Blvd bridge and interchange, and constructing carpool (HOV) lanes in both directions on I-5 in #Burbank. Please #SlowForTheConeZone #BeWorkZoneAlert See more photos at https://t.co/wWE6q9hmA5 https://t.co/wWE6q9hmA5 March 2, 2021 4:19 pm Follow My5LA There is now a second lane open to traffic on northbound Valley View Avenue between N. Firestone Boulevard & Alondra Boulevard. Intersection traffic is controlled by permanent signals. Map below. https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI March 1, 2021 7:48 pm Follow My5LA New N. Firestone Boulevard is now open to traffic between Knott Avenue and Trojan Way in La Mirada. There is a stop sign southbound on Knott Avenue at N. Firestone Boulevard. Map below. https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI March 1, 2021 7:47 pm Follow My5LA New S. Firestone Blvd. connector ramp to Valley View Ave. Bridge now open to traffic. This will allow traffic from Alondra Blvd. / Marquardt Ave. to access Valley View Ave. There is a stop sign at the intersection with the bridge. Green arrows show location of ramp below. https://t.co/9032AIPOtx March 1, 2021 7:44 pm Follow My5LA Drilling holes for piles, as crews construct the new I-5 Burbank Blvd bridge and interchange. This project is adding carpool (HOV) lanes on I-5 in both directions. See more at https://t.co/wWE6q9hmA5 @BurbankCA #Burbank https://t.co/wWE6q9hmA5 March 1, 2021 4:35 pm Follow My5LA

Construction Notice Sign Up

 

Click through to sign up for Timely, Helpful My5LA Info regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe
 

Recent Posts

  • I-5 Construction Advisory – SR-134 to Buena Vista Street, February 26-March 5, 2021
  • Valley View Ave. Interchange Project – February 26, 2021 – March 5, 2021
  • Florence Avenue Interchange Project – February 26, 2021 – March 5, 2021
  • Burbank Blvd Bridge – Photo Gallery, Feb. 2021
  • I-5 NORTH Construction Advisory – SR-134 to Buena Vista Street, February 19-26, 2021
  • Burbank Blvd Bridge Project – An Overview
  • I-5 NORTH Construction Advisory – SR-134 to Buena Vista Street, February 12-19, 2021

Archives

  • 855 454 6335
  • My5LA@dot.ca.gov
  • Title VI Compliance
 
  • email
  • twitter
  • On I-5 at Burbank Blvd - Rebar (reinforcing rods) at the footing of the eastern abutment (end wall) of the new Burb… https://t.co/3c5wSEyVw6

    3:56 pm, March 4, 2021

Follow @My5LA

  • On I-5 at Burbank Blvd - Rebar (reinforcing rods) at the footing of the eastern abutment (end wall) of the new Burb… https://t.co/3c5wSEyVw6

    3:56 pm, March 4, 2021

  • Deck-level view of workers covering rebar stem walls with lumber forms in preparation for first concrete pour on mi… https://t.co/VvcG4N9Uz8

    2:22 pm, March 4, 2021

  • Aerial view of middle section of second half of Valley View Ave. Bridge at I-5 in La Mirada. Workers covering rebar… https://t.co/rU6ie14Pv7

    2:20 pm, March 3, 2021

  • New S. Firestone Blvd. ramp connecting to Valley View Ave. Bridge is open to traffic with a stop sign at the inters… https://t.co/PENuxflCZ9

    8:10 pm, March 2, 2021

  • Traffic using the new right lane open to traffic on NB Valley View Ave. between N. Firestone Blvd. & Alondra Blvd.… https://t.co/7o29tYgUHx

    4:34 pm, March 2, 2021

Follow @My5LA

Quick Links

  • I-5 South Overview
  • I-5 North Overview
  • Project Synopsis
  • Latest I-5 Construction Updates
  • Useful Links

Recent Posts

  • I-5 Construction Advisory – SR-134 to Buena Vista Street, February 26-March 5, 2021
  • Valley View Ave. Interchange Project – February 26, 2021 – March 5, 2021
  • Florence Avenue Interchange Project – February 26, 2021 – March 5, 2021
  • Burbank Blvd Bridge – Photo Gallery, Feb. 2021
  • I-5 NORTH Construction Advisory – SR-134 to Buena Vista Street, February 19-26, 2021

Stay Informed

Click through to sign up for our construction notices regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe

Our Partners

Our Partners
  • Home
  • Updates
  • Contact Us

© 2020 State of California

Back to Top