My5LA My5LA

Menu
  • Home
  • I-5 North
    • SR-14 to Lake Hughes Road
    • Magnolia Blvd to Buena Vista St
    • Ventura Freeway (SR-134) to Magnolia Blvd
  • Florence
    • News – Florence Avenue Interchange
    • Florence Ave Interchange Project
  • Valley View
    • News – Valley View Interchange Project
    • Valley View Interchange Project
  • I-5 South
  • Completed
    • Alondra Boulevard Bridge
    • Carmenita Road Interchange
    • Lake Hughes Rd to Vista Del Lago Rd
    • Hollywood Freeway (SR-170) to Buena Vista St
    • Imperial Highway and Pioneer Boulevard
    • I-5/Antelope Valley Fwy (SR-14) Interchange
    • Rosecrans Avenue and Bloomfield Avenue Bridge
    • SR-14 to Pico Canyon Road/Lyons Avenue
    • SR-118 to Hollywood Fwy (SR-170)
    • SR-118 to I-210
    • Vista Del Lago Rd Overcrossing to Kern County Line
    • Western Ave Interchange
  • Galleries
  • Updates
  • Contact

You are here:

  1. Home
  2. Works
  3. Valley View Ave. – July 30, 2019

Valley View Ave. – July 30, 2019

August 2, 2019

  1. July 30.
  2. July 30.
  3. July 30.
  4. July 30.
  5. July 30.
  6. July 30.
  7. July 30.
  8. July 30.
  9. July 30.
Print Friendly, PDF & Email
Posted in:
  • Construction Images
  • I-5 South
  • Outreach
  • Valley View
  • Valley View

See more

  1. Prev:Imperial Hwy. / Pioneer Blvd. – July 23, 2019
  2. Back: All Works
  3. Next:Florence Ave. – July 30, 2019

Twitter Feed

On I-5 at Burbank Blvd - Rebar (reinforcing rods) at the footing of the eastern abutment (end wall) of the new Burbank Blvd bridge. Crews are constructing carpool lanes in both directions on I-5 and a new interchange here. https://t.co/wWE6q9hmA5 #Burbank @BurbankCA https://t.co/wWE6q9hmA5 March 4, 2021 3:56 pm Follow My5LA Deck-level view of workers covering rebar stem walls with lumber forms in preparation for first concrete pour on middle section of second half of new Valley View Ave. Bridge at I-5 in La Mirada. @CaltransHQ @CaltransOC @CityofLaMirada @CityofSFS https://t.co/zlWQBxP044 March 4, 2021 2:22 pm Follow My5LA Aerial view of middle section of second half of Valley View Ave. Bridge at I-5 in La Mirada. Workers covering rebar stem walls with lumber forms in preparation for first concrete pour. @CaltransHQ @CaltransOC @CityofLaMirada @CityofSFS @CHP_SFS https://t.co/dqNNlUmgAk March 3, 2021 2:20 pm Follow My5LA New S. Firestone Blvd. ramp connecting to Valley View Ave. Bridge is open to traffic with a stop sign at the intersection. This allows traffic from Alondra Blvd./Marquardt Ave. to connect directly to Valley View Ave. @CityofSFS @CityofLaMirada @chp_sfs https://t.co/0rhlOs5lJu March 2, 2021 8:10 pm Follow My5LA Traffic using the new right lane open to traffic on NB Valley View Ave. between N. Firestone Blvd. & Alondra Blvd. (Vehicles turning right onto Valley View Ave. from Firestone Blvd.) https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI March 2, 2021 4:34 pm Follow My5LA Crews are constructing the I-5 Burbank Blvd bridge and interchange, and constructing carpool (HOV) lanes in both directions on I-5 in #Burbank. Please #SlowForTheConeZone #BeWorkZoneAlert See more photos at https://t.co/wWE6q9hmA5 https://t.co/wWE6q9hmA5 March 2, 2021 4:19 pm Follow My5LA There is now a second lane open to traffic on northbound Valley View Avenue between N. Firestone Boulevard & Alondra Boulevard. Intersection traffic is controlled by permanent signals. Map below. https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI March 1, 2021 7:48 pm Follow My5LA New N. Firestone Boulevard is now open to traffic between Knott Avenue and Trojan Way in La Mirada. There is a stop sign southbound on Knott Avenue at N. Firestone Boulevard. Map below. https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI March 1, 2021 7:47 pm Follow My5LA New S. Firestone Blvd. connector ramp to Valley View Ave. Bridge now open to traffic. This will allow traffic from Alondra Blvd. / Marquardt Ave. to access Valley View Ave. There is a stop sign at the intersection with the bridge. Green arrows show location of ramp below. https://t.co/9032AIPOtx March 1, 2021 7:44 pm Follow My5LA Drilling holes for piles, as crews construct the new I-5 Burbank Blvd bridge and interchange. This project is adding carpool (HOV) lanes on I-5 in both directions. See more at https://t.co/wWE6q9hmA5 @BurbankCA #Burbank https://t.co/wWE6q9hmA5 March 1, 2021 4:35 pm Follow My5LA

Construction Notice Sign Up

 

Click through to sign up for Timely, Helpful My5LA Info regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe
 

Recent Posts

  • I-5 Construction Advisory – SR-134 to Buena Vista Street, February 26-March 5, 2021
  • Valley View Ave. Interchange Project – February 26, 2021 – March 5, 2021
  • Florence Avenue Interchange Project – February 26, 2021 – March 5, 2021
  • Burbank Blvd Bridge – Photo Gallery, Feb. 2021
  • I-5 NORTH Construction Advisory – SR-134 to Buena Vista Street, February 19-26, 2021
  • Burbank Blvd Bridge Project – An Overview
  • I-5 NORTH Construction Advisory – SR-134 to Buena Vista Street, February 12-19, 2021

Archives

  • 855 454 6335
  • My5LA@dot.ca.gov
  • Title VI Compliance
 
  • email
  • twitter
  • On I-5 at Burbank Blvd - Rebar (reinforcing rods) at the footing of the eastern abutment (end wall) of the new Burb… https://t.co/3c5wSEyVw6

    3:56 pm, March 4, 2021

Follow @My5LA

  • On I-5 at Burbank Blvd - Rebar (reinforcing rods) at the footing of the eastern abutment (end wall) of the new Burb… https://t.co/3c5wSEyVw6

    3:56 pm, March 4, 2021

  • Deck-level view of workers covering rebar stem walls with lumber forms in preparation for first concrete pour on mi… https://t.co/VvcG4N9Uz8

    2:22 pm, March 4, 2021

  • Aerial view of middle section of second half of Valley View Ave. Bridge at I-5 in La Mirada. Workers covering rebar… https://t.co/rU6ie14Pv7

    2:20 pm, March 3, 2021

  • New S. Firestone Blvd. ramp connecting to Valley View Ave. Bridge is open to traffic with a stop sign at the inters… https://t.co/PENuxflCZ9

    8:10 pm, March 2, 2021

  • Traffic using the new right lane open to traffic on NB Valley View Ave. between N. Firestone Blvd. & Alondra Blvd.… https://t.co/7o29tYgUHx

    4:34 pm, March 2, 2021

Follow @My5LA

Quick Links

  • I-5 South Overview
  • I-5 North Overview
  • Project Synopsis
  • Latest I-5 Construction Updates
  • Useful Links

Recent Posts

  • I-5 Construction Advisory – SR-134 to Buena Vista Street, February 26-March 5, 2021
  • Valley View Ave. Interchange Project – February 26, 2021 – March 5, 2021
  • Florence Avenue Interchange Project – February 26, 2021 – March 5, 2021
  • Burbank Blvd Bridge – Photo Gallery, Feb. 2021
  • I-5 NORTH Construction Advisory – SR-134 to Buena Vista Street, February 19-26, 2021

Stay Informed

Click through to sign up for our construction notices regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe

Our Partners

Our Partners
  • Home
  • Updates
  • Contact Us

© 2020 State of California

Back to Top